Delivery Signal

Synthetic sample · pending approval

Blocked

Northline Advisory

At least one project has a blocked item. Escalation belongs in the review.

As of 10 Oct 2026, 1 of 4 projects is on track (Aster HR — Payroll export). This brief cites rows in the approved export. It does not forecast that a future date will be missed.

10 Oct 2026 · Delivery director · Canonical export · 40 work items · rules 2026-10-11 · result f1fb4eaa03

This week

10–16 Oct · next 17–23 Oct

i

Five lines from the export. A due date is the date in the file. Evidence is the cells. The field list below is every change.

Closed

LUM-3, 3 points.

Evidence
  • work_items LUM-3.status = Done
  • work_items LUM-3.story_points = 3

Moved

FOR-12 lost Alex Rahman. LUM-6 remaining 2→5. AST-4 estimate 3→5.

Evidence
  • work_items FOR-12.assignee = (blank)
  • work_items LUM-6.remaining = 5
  • work_items AST-4.story_points = 5

Next week

Remaining up LUM-6 2→5. Over estimate FOR-21 5 vs 3. KYC ready for UAT 17 Oct, milestone. CED-5 23 Oct, no owner.

Evidence
  • work_items FOR-21.due = 2026-10-18
  • work_items FOR-21.status = In Progress
  • work_items FOR-21.assignee = Samir Adeyemi
  • work_items FOR-21.remaining = 5
  • work_items FOR-21.original_estimate = 3
  • work_items LUM-6.due = 2026-10-20
  • work_items LUM-6.status = To Do
  • work_items LUM-6.assignee = Jonas Berg
  • work_items LUM-6.remaining = 5
  • work_items LUM-6.original_estimate = 8
  • work_items CED-5.due = 2026-10-23
  • work_items CED-5.status = To Do
  • work_items CED-5.assignee = (blank)
  • milestones MS-LUM.due = 2026-10-17
  • milestones MS-LUM.status = Open

Late

LUM-9 → LUM-4, no owners. FOR-12 (no owner) → FOR-20 → Carrier cutover 15 Oct. Later: LUM-5 no owner 28 Oct; LUM-11, LUM-12, LUM-13 no estimate 30 Oct.

Evidence
  • work_items LUM-9.summary = Approve KYC vendor contract
  • work_items LUM-9.due = 2026-10-03
  • work_items LUM-9.status = Waiting
  • work_items LUM-9.assignee = (blank)
  • work_items LUM-9.priority = Highest
  • work_items LUM-4.summary = KYC document upload
  • work_items LUM-4.due = 2026-10-06
  • work_items LUM-4.status = To Do
  • work_items LUM-4.assignee = (blank)
  • work_items LUM-4.priority = Highest
  • dependencies DEP-KYC.predecessor = LUM-9
  • dependencies DEP-KYC.successor = LUM-4
  • work_items FOR-12.summary = Rotate carrier credentials
  • work_items FOR-12.due = 2026-10-08
  • work_items FOR-12.status = In Progress
  • work_items FOR-12.assignee = (blank)
  • work_items FOR-12.priority = Highest
  • work_items FOR-20.summary = Sandbox returns 401 for pick tickets
  • work_items FOR-20.due = 2026-10-12
  • work_items FOR-20.status = Blocked
  • work_items FOR-20.assignee = Samir Adeyemi
  • work_items FOR-20.priority = High
  • work_items FOR-20.blocked_by = FOR-12
  • milestones MS-FOR.due = 2026-10-15
  • milestones MS-FOR.status = Open
  • dependencies DEP-CRED.predecessor = FOR-12
  • dependencies DEP-CRED.successor = FOR-20
  • dependencies DEP-CUT.predecessor = FOR-20
  • dependencies DEP-CUT.successor = MS-FOR
  • work_items LUM-5.priority = Highest
  • work_items LUM-5.due = 2026-10-28
  • work_items LUM-5.assignee = (blank)
  • work_items LUM-5.story_points = 8
  • work_items LUM-11.priority = Highest
  • work_items LUM-11.due = 2026-10-30
  • work_items LUM-11.assignee = Nora Feld
  • work_items LUM-11.story_points = (blank)
  • work_items LUM-12.priority = Highest
  • work_items LUM-12.due = 2026-10-30
  • work_items LUM-12.assignee = Jonas Berg
  • work_items LUM-12.story_points = (blank)
  • work_items LUM-13.priority = Highest
  • work_items LUM-13.due = 2026-10-30
  • work_items LUM-13.assignee = Nora Feld
  • work_items LUM-13.story_points = (blank)

Disagrees

N-1 vs CED-2 and CED-3, 51d. 85% is 8/37. N-2: one item.

Evidence
  • notes N-1.text = Weekly status: Cedar is green and on track. No risks to raise. The team is heads down on the portal.
  • notes N-1.date = 2026-10-09
  • work_items CED-2.status = In Progress
  • work_items CED-2.updated = 2026-08-18
  • work_items CED-2.due = 2026-09-30
  • work_items CED-3.status = In Progress
  • work_items CED-3.updated = 2026-08-20
  • work_items CED-3.due = 2026-10-02
  • work_items LUM-1.percent_complete = 85
  • work_items LUM-2.status = Done
  • work_items LUM-2.story_points = 5
  • work_items LUM-3.status = Done
  • work_items LUM-3.story_points = 3
  • work_items LUM-4.status = To Do
  • work_items LUM-4.story_points = 8
  • work_items LUM-5.status = To Do
  • work_items LUM-5.story_points = 8
  • work_items LUM-6.status = To Do
  • work_items LUM-6.story_points = 5
  • work_items LUM-7.status = To Do
  • work_items LUM-7.story_points = 3
  • work_items LUM-8.status = To Do
  • work_items LUM-8.story_points = 3
  • work_items LUM-10.status = To Do
  • work_items LUM-10.story_points = 2
  • notes N-2.text = Leadership slide says onboarding is 85% complete and the only open item is copy for the app store.

Flow

14 closed in these 8 weeks. The latest week closed 2.

i

The sentence is how many stories, bugs, and tasks were marked Done in each of the last eight weeks. The figures under it are the portfolio total.

Closed

1

3 pts

WIP

18

1 better

Dates reached

16

1 better

Cycle p85

121d

16 finished

4 worse

The ask

i

What the delivery lead, product owner, or scrum master needs from the room. Questions are drawn from top risks and open decisions. Nothing is sent until a person approves the brief.

Decision 01

LUM-9 Approve KYC vendor contract

Owner missing · Due 3 Oct 2026

OverdueUnknown: ownerBefore LUM-4

Ask 01

Who owns FOR-12 (Rotate carrier credentials)?

Ask 02

Who owns LUM-4 (KYC document upload)?

Ask 03

What changed on Cedar Clinics — Patient portal after 20 Aug 2026? N-1 and the work-item export disagree.

Ask 04

Does the dependent milestone still hold while FOR-20 is blocked by FOR-12?

Ask 05

Which completion figure should the steering pack use: 85% or 8 of 37 story points?

Ask 06

Who can close LUM-9 (Approve KYC vendor contract)? No owner is named. Recorded successor: LUM-4.

Delivery pulse

i

Each card is one project: On track, Needs attention, Blocked, or Not checked. The bar is story points marked Done, among items that have a story point or effort. An epic, feature, or initiative is listed on that card and counted from its direct children. Remaining and the original estimate are sums of rows where both cells are numbers.

Field changes

i

Every compared cell: status, assignee, priority, due date, blocker, percent complete, story points, and remaining. The week reading is the conclusion. This list is the audit.

Board

Levels, then the path

i

Stories, bugs, and tasks. A target is filled only from a due date in the file. Marked Done and Dates reached draw that target. WIP, cycle p85, blocked, and unassigned have no target in the file. Each chart uses its own scale. Cycle p85 describes items already Done. This is not a forecast.

Marked Done

2/ 4

latest week

Gap 2same

Latest week against items dated that week.

Dates reached

16/ 20

Gap 4 1 better

Items already Done whose due date is on or before the report date, against every such date.

WIP

18

1 better

No target in the file. The mark is this week on the eight-week high.

Cycle p85

121d

16 finished

4 worse

No target in the file. Finished items only.

Since last export

1

3 pts

Moved to Done since the previous export.

Blocked

1

same

No target in the file.

Unassigned

5

1 worse

No target in the file.

Over time

Marked Done

Marked DoneDated that week

Bars are items marked Done. The dashed line is due dates in that week. They are not the same items.

02422 Aug29 Aug5 Sep12 Sep19 Sep26 Sep3 Oct10 Oct

Over time

Dates reached each week

ReachedDated that week

Bars are due dates reached that week. The dashed line is items dated that week.

02422 Aug29 Aug5 Sep12 Sep19 Sep26 Sep3 Oct10 Oct

Over time

WIP

Open stories, bugs, and tasks at each week end.

16212722 Aug29 Aug5 Sep12 Sep19 Sep26 Sep3 Oct10 Oct

Over time

Cycle p85

Cycle p85 of items already Done by that week end. Gaps are weeks with nothing finished.

11611912222 Aug29 Aug5 Sep12 Sep19 Sep26 Sep3 Oct10 Oct

Marked Done

1/ 1

latest week

Gap 0same

Latest week against items dated that week.

Dates reached

4/ 4

Gap 0same

Items already Done whose due date is on or before the report date, against every such date.

WIP

1

same

No target in the file. The mark is this week on the eight-week high.

Cycle p85

65d

4 finished

same

No target in the file. Finished items only.

Since last export

0

Moved to Done since the previous export.

Blocked

0

same

No target in the file.

Unassigned

0

same

No target in the file.

Over time

Marked Done

Marked DoneDated that week

Bars are items marked Done. The dashed line is due dates in that week. They are not the same items.

0122 Aug29 Aug5 Sep12 Sep19 Sep26 Sep3 Oct10 Oct

Over time

Dates reached each week

ReachedDated that week

Bars are due dates reached that week. The dashed line is items dated that week.

0122 Aug29 Aug5 Sep12 Sep19 Sep26 Sep3 Oct10 Oct

Over time

WIP

Open stories, bugs, and tasks at each week end.

03622 Aug29 Aug5 Sep12 Sep19 Sep26 Sep3 Oct10 Oct

Over time

Cycle p85

Cycle p85 of items already Done by that week end. Gaps are weeks with nothing finished.

29517422 Aug29 Aug5 Sep12 Sep19 Sep26 Sep3 Oct10 Oct

Marked Done

0/ 0

latest week

Gap 0same

Latest week against items dated that week.

Dates reached

3/ 5

Gap 2same

Items already Done whose due date is on or before the report date, against every such date.

WIP

4

same

No target in the file. The mark is this week on the eight-week high.

Cycle p85

64d

3 finished

same

No target in the file. Finished items only.

Since last export

0

Moved to Done since the previous export.

Blocked

0

same

No target in the file.

Unassigned

1

same

No target in the file.

Over time

Marked Done

Marked DoneDated that week

Bars are items marked Done. The dashed line is due dates in that week. They are not the same items.

01222 Aug29 Aug5 Sep12 Sep19 Sep26 Sep3 Oct10 Oct

Over time

Dates reached each week

ReachedDated that week

Bars are due dates reached that week. The dashed line is items dated that week.

01222 Aug29 Aug5 Sep12 Sep19 Sep26 Sep3 Oct10 Oct

Over time

WIP

Open stories, bugs, and tasks at each week end.

35722 Aug29 Aug5 Sep12 Sep19 Sep26 Sep3 Oct10 Oct

Over time

Cycle p85

Cycle p85 of items already Done by that week end. Gaps are weeks with nothing finished.

42567022 Aug29 Aug5 Sep12 Sep19 Sep26 Sep3 Oct10 Oct

Marked Done

0/ 2

latest week

Gap 2 1 worse

Latest week against items dated that week.

Dates reached

5/ 6

Gap 1same

Items already Done whose due date is on or before the report date, against every such date.

WIP

4

same

No target in the file. The mark is this week on the eight-week high.

Cycle p85

129d

5 finished

same

No target in the file. Finished items only.

Since last export

0

Moved to Done since the previous export.

Blocked

1

same

No target in the file.

Unassigned

1

1 worse

No target in the file.

Over time

Marked Done

Marked DoneDated that week

Bars are items marked Done. The dashed line is due dates in that week. They are not the same items.

01222 Aug29 Aug5 Sep12 Sep19 Sep26 Sep3 Oct10 Oct

Over time

Dates reached each week

ReachedDated that week

Bars are due dates reached that week. The dashed line is items dated that week.

01222 Aug29 Aug5 Sep12 Sep19 Sep26 Sep3 Oct10 Oct

Over time

WIP

Open stories, bugs, and tasks at each week end.

03622 Aug29 Aug5 Sep12 Sep19 Sep26 Sep3 Oct10 Oct

Over time

Cycle p85

Cycle p85 of items already Done by that week end. Gaps are weeks with nothing finished.

11812513222 Aug29 Aug5 Sep12 Sep19 Sep26 Sep3 Oct10 Oct

Marked Done

1/ 1

latest week

Gap 0 1 better

Latest week against items dated that week.

Dates reached

4/ 5

Gap 1 1 better

Items already Done whose due date is on or before the report date, against every such date.

WIP

9

1 better

No target in the file. The mark is this week on the eight-week high.

Cycle p85

129d

4 finished

19 worse

No target in the file. Finished items only.

Since last export

1

3 pts

Moved to Done since the previous export.

Blocked

0

same

No target in the file.

Unassigned

3

same

No target in the file.

Over time

Marked Done

Marked DoneDated that week

Bars are items marked Done. The dashed line is due dates in that week. They are not the same items.

0122 Aug29 Aug5 Sep12 Sep19 Sep26 Sep3 Oct10 Oct

Over time

Dates reached each week

ReachedDated that week

Bars are due dates reached that week. The dashed line is items dated that week.

0122 Aug29 Aug5 Sep12 Sep19 Sep26 Sep3 Oct10 Oct

Over time

WIP

Open stories, bugs, and tasks at each week end.

8101322 Aug29 Aug5 Sep12 Sep19 Sep26 Sep3 Oct10 Oct

Over time

Cycle p85

Cycle p85 of items already Done by that week end. Gaps are weeks with nothing finished.

5210014922 Aug29 Aug5 Sep12 Sep19 Sep26 Sep3 Oct10 Oct

Metrics

One team, or the total

i

Stories, bugs, and tasks. All is the total. A target is filled only from a due date in the file. Marked Done compares items marked Done that week with items dated that week. They are not the same items. Dates reached counts items whose due date is on or before the report date, and how many of those are Done. The gap there is items still open. The solid line is the actual. The dashed line is items dated that week. Every team uses the portfolio scale for that row. A triangle points the way the number moved. Better means more finished work, or fewer open, blocked, unassigned, or days. Cycle p85 describes items already Done. This is not a forecast.

KPIActualTargetGapChangeTrendline22 Aug–10 Oct
Since last export1 · 3 pts———
Marked Done2 · latest week42same
Dates reached16204 1 better
WIP18—— 1 better
Cycle p85121d · 16 finished—— 4 worse
Blocked1——same—
Unassigned5—— 1 worse—
Since last export0———
Marked Done1 · latest week10same
Dates reached440same
WIP1——same
Cycle p8565d · 4 finished——same
Blocked0——same—
Unassigned0——same—
Since last export0———
Marked Done0 · latest week00same
Dates reached352same
WIP4——same
Cycle p8564d · 3 finished——same
Blocked0——same—
Unassigned1——same—
Since last export0———
Marked Done0 · latest week22 1 worse
Dates reached561same
WIP4——same
Cycle p85129d · 5 finished——same
Blocked1——same—
Unassigned1—— 1 worse—
Since last export1 · 3 pts———
Marked Done1 · latest week10 1 better
Dates reached451 1 better
WIP9—— 1 better
Cycle p85129d · 4 finished—— 19 worse
Blocked0——same—
Unassigned3——same—
Weekly counts
TeamSeries22 Aug29 Aug5 Sep12 Sep19 Sep26 Sep3 Oct10 Oct
AllMarked Done22122122
AllDated22122234
Aster HRMarked Done00011011
Aster HRDated00010111
Cedar ClinicsMarked Done11010000
Cedar ClinicsDated11010020
Forge LogisticsMarked Done01001010
Forge LogisticsDated01001002
Lumen BankMarked Done10100101
Lumen BankDated10101101
Evidence
  • work_items LUM-3.status = Done
  • work_items LUM-3.updated = 2026-10-09
  • work_items LUM-3.story_points = 3
  • work_items LUM-3.status = Done
  • work_items LUM-3.updated = 2026-10-09
  • work_items LUM-3.type = Story
  • work_items AST-3.status = Done
  • work_items AST-3.updated = 2026-10-06
  • work_items AST-3.type = Story
  • work_items LUM-4.status = To Do
  • work_items LUM-5.status = To Do
  • work_items LUM-6.status = To Do
  • work_items LUM-7.status = To Do
  • work_items LUM-8.status = To Do
  • work_items LUM-10.status = To Do
  • work_items LUM-11.status = To Do
  • work_items LUM-12.status = To Do
  • work_items LUM-13.status = To Do
  • work_items CED-2.status = In Progress
  • work_items CED-3.status = In Progress
  • work_items CED-4.status = To Do
  • work_items CED-5.status = To Do
  • work_items FOR-12.status = In Progress
  • work_items FOR-20.status = Blocked
  • work_items FOR-21.status = In Progress
  • work_items FOR-32.status = To Do
  • work_items AST-4.status = In Progress
  • work_items FOR-2.created = 2026-04-02
  • work_items FOR-2.updated = 2026-08-01

Top risks

i

The highest-severity findings that cite a row in the export. Evidence stays folded under each one.

fact · severity 90

FOR-12 is Highest priority, open, and has no assignee.

FOR-12 (Rotate carrier credentials) is In Progress, due 8 Oct 2026 (before this report), and the assignee cell is empty. The item comment says "Unassigned after Alex Rahman went on leave. Due yesterday."

Evidence, 5 fields
  • work_items FOR-12.assignee = (blank)
  • work_items FOR-12.priority = Highest
  • work_items FOR-12.status = In Progress
  • work_items FOR-12.due = 2026-10-08
  • work_items FOR-12.comment = Unassigned after Alex Rahman went on leave. Due yesterday.

fact · severity 90

LUM-4 is Highest priority, open, and has no assignee.

LUM-4 (KYC document upload) is To Do, due 6 Oct 2026 (before this report), and the assignee cell is empty. The item comment says "Critical path. No owner after the previous owner left the squad."

Evidence, 5 fields
  • work_items LUM-4.assignee = (blank)
  • work_items LUM-4.priority = Highest
  • work_items LUM-4.status = To Do
  • work_items LUM-4.due = 2026-10-06
  • work_items LUM-4.comment = Critical path. No owner after the previous owner left the squad.

inference · severity 86

Cedar Clinics — Patient portal is described as on track, but the export disagrees.

N-1 on 9 Oct 2026 says the work is on track. CED-2 and CED-3 are already overdue. The newest update among these open items is 20 Aug 2026. CED-2 due 30 Sep 2026, updated 18 Aug 2026, CED-3 due 2 Oct 2026, updated 20 Aug 2026.

Evidence, 8 fields
  • notes N-1.text = Weekly status: Cedar is green and on track. No risks to raise. The team is heads down on the portal.
  • notes N-1.date = 2026-10-09
  • work_items CED-2.status = In Progress
  • work_items CED-2.updated = 2026-08-18
  • work_items CED-2.due = 2026-09-30
  • work_items CED-3.status = In Progress
  • work_items CED-3.updated = 2026-08-20
  • work_items CED-3.due = 2026-10-02

fact · severity 85

FOR-20 is blocked by FOR-12, which is overdue (8 Oct 2026) and unassigned.

FOR-20 (Sandbox returns 401 for pick tickets) is Blocked by FOR-12 (Rotate carrier credentials). FOR-12 is In Progress, overdue (8 Oct 2026) and unassigned. Carrier cutover (MS-FOR) is due 15 Oct 2026.

Evidence, 7 fields
  • work_items FOR-20.status = Blocked
  • work_items FOR-20.blocked_by = FOR-12
  • work_items FOR-12.status = In Progress
  • work_items FOR-12.assignee = (blank)
  • work_items FOR-12.due = 2026-10-08
  • dependencies DEP-CUT.successor = MS-FOR
  • milestones MS-FOR.due = 2026-10-15

fact · severity 80

Lumen Bank — Mobile onboarding reports 85% complete; 8 of 37 story points are done.

LUM-1 percent_complete is 85. Child items with story points total 37, of which 8 are Done (22%). Still open at High or Highest: LUM-4 (KYC document upload), LUM-5 (Sanctions screening integration), LUM-6 (Biometric capture), LUM-11 (Address proof), LUM-12 (Device binding), LUM-13 (Fraud rules). N-2 says "Leadership slide says onboarding is 85% complete and the only open item is copy for the app store."

Evidence, 18 fields
  • work_items LUM-1.percent_complete = 85
  • work_items LUM-2.status = Done
  • work_items LUM-2.story_points = 5
  • work_items LUM-3.status = Done
  • work_items LUM-3.story_points = 3
  • work_items LUM-4.status = To Do
  • work_items LUM-4.story_points = 8
  • work_items LUM-5.status = To Do
  • work_items LUM-5.story_points = 8
  • work_items LUM-6.status = To Do
  • work_items LUM-6.story_points = 5
  • work_items LUM-7.status = To Do
  • work_items LUM-7.story_points = 3
  • work_items LUM-8.status = To Do
  • work_items LUM-8.story_points = 3
  • work_items LUM-10.status = To Do
  • work_items LUM-10.story_points = 2
  • notes N-2.text = Leadership slide says onboarding is 85% complete and the only open item is copy for the app store.

Checked and set aside

i

A signal the rules looked at and did not promote. An overdue predecessor is set aside when its successor is already Done.

Legacy data extract (MS-LEG) is overdue, and it does not block FOR-3.
  • DEP-LEG says MS-LEG precedes FOR-3. Legacy data extract (MS-LEG) is overdue, and FOR-3 is Done. N-5 says "We no longer need the legacy data extract. FOR-3 was finished from the snapshot feed in July."

Also noted

i

Findings that cleared the severity threshold and did not fit at the top of the brief.